• Archives

Prakindo News December 2016

Edisi No: 12/2016 Desember 2016

COMMISIONING TEST

&

PRE-HAND OVER OF WATER TREATMENT PLANT CAPACITY 2 X 10 L/s

IKK SABAK AUH KAB. SIAK PROV. RIAU

On Wednesday, 7 December 2016, PT Prakarsa Enviro Indonesia has done Commisioning Test and Pre-Hand Over of Water Treatment Plant capacity 2 x 10 L/s in Sabak Auh, Siak district, Province of Riau. This event was attended by Provincial Public Works of Riau (Dinas Pekerjaan Umum Provinsi Riau & Dinas Cipta Karya Kabupaten Siak).
 

The results of this commisioning test showed that WTP system of PT Prakarsa Enviro Indonesia has been able to process the color water from Siak River into clean water that is fit for use by local people.
This clean water, either physics or chemistry, has complied to the terms Regulation of the Minister of Health Number 492 / 2010. The clean water quality is as follows:

Parameter Unit Raw Water Clean water

Regulation of the Minister of Health

Number 492 / 2010

TDS mg/L 6850 6 500
Turbidity NTU 1790.3 0.35 5
pH mg/L 6.09 7.22 6.5 – 7.5
Hardness(CaCO3) mg/L 803 61 500
Chloride mg/L 3573 1 250
Besi (Fe) mg/L 0.4 <0.0040 0.3
Total Coliform Jlh/100 ml 96 0 0
Colour PtCo 276 1 15

(FTC)